Ivory Coast Terminal de San Pedro - Port of San Pedro
Technical specifications
- Installed capacity: 230k moves (0.3m TEUs)
- Draught: 11.6m
- Quay length: 300m
- Area: 5ha
- Maximum vessel size: 4,800 TEUs
- No. of Quay Cranes (MHC): 4
Key features
- Located on the Gulf of Guinea, ideally positioned to serve as a transhipment hub for the West African coast
- The port of San Pedro is the World leader of the exportation of cacao beans
- San Pedro is the second economic gateway to Ivory Coast after Abidjan
- Serves as a gateway to the landlocked countries of Mali, Burkina Faso, Niger and to the Easthern areas of Liberia and Guinea
- A Public Private Partnership (PPP) for the construction, the operation and maintenance of a Greenfield Terminal under a 35-year concession agreement is ongoing
- After completion, the Terminal will offer a total aggregated quay length of 806 meters and 30 hectares of storage area, for a total potential capacity of 1 million TEU and a maximum draft of 17 meters which allows for berthing vessels with a loading capacity of 14.000 TEU.